Short description
The guideline is applicable to the cycle-time determination of transport sequences which are performed using cranes. Crane control can be manual, semi- or fully automatic. The following sequences of transport of unit loads or bulk material are considered: between two defined points, into or out of a warehouse with a defined storage volume varying stochastically