Dear customers,
Currently, the printing and shipping of print documents (standards and regulations) are delayed.
If available, you may also order the document in digital download format; it is usually available within a few minutes (or within one business day at the latest if manual review is required).
To convert an existing order, please email international@dinmedia.de, including your order number or customer number.
We apologize for the inconvenience and thank you for your patience.
Your DIN Media
Standard [WITHDRAWN]
Product information on this site:
Quick delivery via download or delivery service
All transactions are encrypted
ATV DIN 18305 "Groundwater lowering" has been editorially revised by the German Committee for Construction Contract Procedures (DVA). Clause 5 "Settlement of accounts" has been restructured. This standard deals with the installation, removal and operation of, and alterations to, ground water lowering systems where the water is discharged by way of open conduits or pipes.
This document replaces DIN 18305:2012-09 .
This document has been replaced by: DIN 18305:2016-09 , DIN 18305:2019-09 .