Dear customers,
Currently, the printing and shipping of print documents (standards and regulations) are delayed.
If available, you may also order the document in digital download format; it is usually available within a few minutes (or within one business day at the latest if manual review is required).
To convert an existing order, please email international@dinmedia.de, including your order number or customer number.
We apologize for the inconvenience and thank you for your patience.
Your DIN Media
Standard [CURRENT]
Product information on this site:
Quick delivery via download or delivery service
All transactions are encrypted
The standards about mine plans shall be used according to the Markscheider-Bergverordnung (MarksschBergV) (Mine Surveyors' Ordinance) for the creation and development of maps, drawings and plans of mine plans in all mining branches. Shafts in underground mining provide the only access to the reservoir. Accordingly, shafts are important for the operation of mines; on the other hand, they shall be secured accordingly after operation has been discontinued in order to prevent a hazard for the general public. According to the Mine Surveyors' Ordinance, a shaft plan shall be prepared for every shaft where all important information, such as rock layers, security relevant areas, shaft sinking methods, shaft lining, shaft backfilling, are documented. The standard contains the signs, short forms and terms which shall be used in the mine plan. The standard is illustrated by two extensive examples for mine plans in small-scale and large-scale representation. The standard has been prepared by Working Committee NA 008-11-01-05 AK "Grubenbaue" ("Underground workings") at Working Committee "Markscheidewesen" ("Mine surveying") of FABERG.
This document replaces DIN 21913-6:2004-07 .