Dear customers,
Currently, the printing and shipping of print documents (standards and regulations) are delayed.
If available, you may also order the document in digital download format; it is usually available within a few minutes (or within one business day at the latest if manual review is required).
To convert an existing order, please email international@dinmedia.de, including your order number or customer number.
We apologize for the inconvenience and thank you for your patience.
Your DIN Media
Standard [CURRENT]
Product information on this site:
Quick delivery via download or delivery service
All transactions are encrypted
This standard specifies the general principles for the execution of works for micropile construction having a small diameter (for drilled micropiles, a shaft diameter smaller than 300 mm and for driven micropiles, a shaft diameter smaller than 150 mm) and which can be usually driven into the ground with small drilling or piling equipment. The committee responsible for this standard is NA 005-05-07 AA "Baugrund; Pfähle (SpA zu CEN/TC 288/WG 16 sowie CEN/TC 341/WG 4 und 7)" ("Soil; piles (Mirror Committee of CEN/TC 288/WG 16, and CEN/TC 341/WG 4 and 7)") at DIN Standards Committee Building and Civil Engineering (NABau).
This document replaces DIN EN 14199:2012-01 .
This document has been corrected by: DIN EN 14199 Berichtigung 1:2016-09 .