RESS Cell Package Integrity Requirements and Tests
new

Standard [NEW]

SAE J 3337:2026-07-14

RESS Cell Package Integrity Requirements and Tests

Publication date
2026-07-14
Original language
English
Pages
27

155.20 EUR VAT included

145.05 EUR VAT excluded

Format and language options

PDF download
  • 155.20 EUR

Shipment (3-5 working days)
  • 155.20 EUR

Monitor with the Standards Ticker

This option is only available after login.
Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2026-07-14
Original language
English
Pages
27
Loading recommended items...

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Short description

This recommended practice (RP) presents a methodology to evaluate RESS Cells Closure Integrity (Leak Tightness) requirement. This RP applies to two types of RESS Cells, each containing liquid electrolyte: Lithium ion (Li-ion) Cells and Sodium ion (Na-ion) Cells. The Equivalent Channel Method is used as a suggested cell closure integrity requirement for a given RESS Cell design during its production and product validation phases. The Closure Integrity requirements intended to assure no electrolyte leakage and no excessive moisture ingress during the usage of these cells as part of the RESS (Battery Pack), which is crucial to assure the safety and performance of these RESS. This RP specifies non-destructive Integrity (leak) testing processes of the Cell Closure. It describes approved leak testing technologies, testing procedures, tooling requirements, and leak test systems validation/verification requirements. This document may be applied to RESS Cell Closure Integrity testing during their initial product validation and their in-line 100% of production integrity/leak testing. This RP applies to RESS Cells with rigid packaging (cylindrical or prismatic) or flexible packaging (pouch).
Loading recommended items...