To our valued customers,

At last: 

Beuth Verlag is now DIN Media. 

You can find out more about our new name and the reasons behind it here.

To use our new website without any hiccups, please clear your browser cache. 

Yours sincerely,

DIN Media

Standards Worldwide
Standards Worldwide
Phone +49 30 58885700-07

Technical rule [WITHDRAWN]

DIN CEN ISO/TS 16530-2:2016-05

DIN SPEC 91087:2016-05

Well integrity - Part 2: Well integrity for the operational phase (ISO/TS 16530-2:2014); English version CEN ISO/TS 16530-2:2015

German title
Bohrungsintegrität - Teil 2: Bohrungsintegrität für die Betriebsphase (ISO/TS 16530-2:2014); Englische Fassung CEN ISO/TS 16530-2:2015
Publication date
2016-05
Original language
English
Pages
107
Procedure
Pre-Standard

Please select

from 173.00 EUR VAT included

from 161.68 EUR VAT excluded

Purchasing options

PDF download 1
  • 173.00 EUR

Shipment (3-5 working days) 1
  • 209.00 EUR

1

 Attention: Document withdrawn!

Publication date
2016-05
Original language
English
Pages
107
Procedure
Pre-Standard

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Overview

This Technical Specification provides requirements and methods to the oil and gas industry to manage well integrity during the well operational phase. The operational phase is considered to extend from handover of the well after construction, to handover prior to abandonment. This represents only the period during the life cycle of the well when it is being operated. The scope of the Technical Specification includes: - A description of the processes required to assess and manage risk within a defined framework. The risk assessment process also applies when deviating from this Technical Specification. - The process of managing well integrity by operating wells in compliance with operating limits for all well types that are defined based on exposure of risk to people, environment, assets and reputation. The management of well integrity is supported by associated maintenance/monitoring plans, technical reviews and the management of change. - The assessment of existing assets (wells / fields) in order to start the process of Well Integrity Management in accordance with this technical specification. - The handover process required when changing from one activity to another during the operational phase. The scope of the Technical Specification applies to all wells that are utilized by the oil and gas industry, regardless of their age, type or location. The scope of the Technical Specification does NOT apply to: - The periods during well intervention or work-over activities but it DOES include the result of the intervention and any impact that this can have to the well envelope and the associated well barriers. - The equipment that is required or used outside the well envelope for a well intervention such as wire-line or coiled tubing or a pumping package. The responsible committee for German collaboration is Working Group NA 109-00-01-04 AK "Bohr- und Fördereinrichtungen - Spiegelausschuss zu ISO/TC 67/SC 4" ("Drilling and production equipment - mirror committee to ISO/TC 67/SC 4)") at DIN Standards Committee Petroleum and Natural Gas Industries (NÖG).

Content
ICS
75.180.10

Cooperation at DIN

Loading recommended items...
Loading recommended items...
Loading recommended items...
Loading recommended items...